Main components: lead-free paint, acrylic acid copolymer, pyrethroids microcapsules, other additives and water.
Glossiness: Matte/ silk
Theoretical shelling-out area: 10-13kg/m^2/time (dry film thickness: 30μm, the actual paint consumption is according to the application process, film surface hardness, roughness and appllication environment.)
Drying time: Surface: 60 minutes/25℃, recoat: 2 hour/ 25℃ (Drying time according to the environment temperature and humidity)
Painting layer: 2-3 layers, if dark color, need to apply more layers.
Application reference:
Application method: paint brush, roller, spray or airless spraying
Dilution water: Dilution ratio Depending on the degree of difficulty and the temperature of the construction of different resolution of the right amount of water dilution.
Construction condition: temperaure: 5-40℃, humidity: under 85%
Ensure that the pre coated surface moisture content is less than 10%, the pH value of less than 10
Tool cleaning: all tools should be cleaned immediately with thinner
Maintenance time of paint film:
7 days/ above 25℃; extend properly at low temperature (not lower than 5℃)
Storage: stored at 0-35℃, cool, dry place, not open and proper storage environment, shelf life of one year